4th millennium BC Ancient Egypt Įvidence from Ancient Egypt shows that the early Egyptians knew how to assemble planks of wood into a ship hull as early as 3100 BC. They sailed in shallow coastal waters of the Persian Gulf. They were made from bundled reeds coated in bitumen and had bipod masts. The earliest known depictions (including paintings and models) of shallow-water sailing boats is from the 6th to 5th millennium BC of the Ubaid period of Mesopotamia. The dismantling of ships is called ship breaking. The construction of boats is a similar activity called boat building. Shipbuilding and ship repairs, both commercial and military, are referred to as " naval engineering". Shipbuilders, also called shipwrights, follow a specialized occupation that traces its roots to before recorded history. It normally takes place in a specialized facility known as a shipyard. Shipbuilding is the construction of ships and other floating vessels. Check out more pics at to be confused with Boat building. Cleats, eye bolts, and other accessories are great dock accents as well. If so, you will need additional hardware - backing plates, washer plates and end corners.Īdditional Accessories: Rub Rail or Dock Bumper and Dock Corners can be used to provide a nice protective edge to your floating dock. NOTE: Carriage bolts (1/2” x 3”) can be substituted for lag bolts in connecting hardware (angles, inside corners, hinge sets, hoops, etc) if desired. Once appropriate placement of floating dock is obtained, secure piling hoops and/or connecting hardware with ½” x 2” SS lag bolt sets provided. If using piling hoops or other connecting hardware,position floating dock in the water along side the appropriate piling, etc.,prior to securing hardware. Once floating docks are placed in water, align floating docks and secure hinge sets with connector pins provided. Secure corresponding male and female connectors with ½” x 2” SS lag bolt sets using impact wrench or socket ratchet. If using hinge sets to adjoin floating dock sections, mark placement with a pencil prior to putting docks in the water to assure appropriate alignment of male and female connectors. Once construction is complete, push floating dock into water and secure to appropriate pilings or poles using connecting hardware. Once decking is complete, additional trimming of edges with skill or chop saw may be necessary to even edges. (Decking screws may be substituted for nails if desired). Deck boards can now be nailed to the frame at this point. In such case, alternate placement of angles should accommodate anticipated high stress areas. NOTE: Alternate positioning of angles may be appropriate for your situation. Position angles and secure with 5/16” x 1 ½” lag bolt sets using impact wrench or socket ratchet. Once floats are secured, you will need 2-4 strong persons to flip the floating dock over or if you have a tractor like Bruce, you may be able to flip it over by yourself. Using impact wrench or socket ratchet, secure with 5/16” x 1 ½” lag bolt sets (8 lag bolt sets per inside corner or may substitute carriage bolts) Insert inside corners in each corner of the frame centered vertically. Length of stringers will need to be cut approximately 3” (accommodating for end stringers- 1 ½” each) to assure accurate length of 12’ for the frame.) Otherwise, the frame will measure 12’ and 3” long, which is okay…you won’t need additional floats or hardware but may need an additional deck board.) If using composite board, stringers are to be placed 18” on center. (Note: Lumber will need to be measured and cut to appropriate lengths. Secure framing with nails using hammer or nail gun. Cross Stringers (2”圆”x 12’) to be placed 2 foot on center to support frame. Using chop saw or skill saw, cut all lumber to appropriate lengths per material list for construction of a 10 x 12’ floating dock.Ĭonstruct frame for floating dock using end stringers (2”圆”x 10’) and side stringers (2”圆”x 12’). Nails – 5-10 lbs #16 Penny Ring Shank Nails or your choice.Īssembly all necessary tools and materials required. (May substitute a composite or other decking material if desired) Pressure-treated Lumber- For Frame/Bracing: Tools Required: Hammer or Nail Gun, Impact Wrench or Socket Ratchet, Measuring Tape, Pencil, Square, Chop Saw or Skill Saw, Drill if needed.ĩ – Dock Floats – Polyflanged foam filled floats.Ĥ – Inside Corners – Galvanized Heavy-dutyġ10 – SS 5/16 x 1 ½” lag bolt sets (bolt and washer) Now he has easier access to the water from his standing dock and can use the floating dock for swimming, launching kayaks, canoes or accessing his boat. My friend Bruce built this wood floating dock from a floating dock kit by It was easy to build and he saved a lot of money doing it himself.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |